Dr. Glick touched on the many changes happening at ASU and its move from a ‘triple AAA’ university up to the ‘majors.’ As a result many organizations are watching with great interest what ASU is doing and how it is accomplishing these changes. Dr. Glick discussed the following:
-
Use of technology to enhance teaching, discovery of new knowledge and community enrichment
-
Downtown Campus has funding from the City of Phoenix to purchase land, along with renovation of existing buildings. Anticipate approximately 15,000 students at downtown campus.
-
Development of new schools on existing campuses, planning of Los Arcos Innovation Park
-
Goal of 100,000 students online which requires cost effective method for teaching increased number of students
-
Consequences of all the changes is stressing and stretching the current system. Result is upgrade to basic IT infrastructure which was covered in more detail by Dr. Lewis.
-
State of IT – Dr. Lewis
The following notes was taken from Dr. Lewis’ presentation
-
ABOR issues/pressures
More oversight by ABOR over the past two years. A committee involving the Tri-Universities has been established with each president participating and identifying how they are actively accomplishing:
-
Centralization of Administrative system
-
IT Architectural Standards
-
Project Review process
-
Any IT activity of $100,000 or more over a 5 year period must follow ABOR approval process
-
One third of expenditures are by Central IT. The remaining is within the Colleges
-
Funding Pressures
-
Increase demand for resources and services
-
Demands for IT as utility service
-
Security
-
Storage (approximately 122TB of data being handled by Central IT now)
-
Archiving
-
Networking
-
Resources/Services required by New American University
-
Need for Enhanced Communications
-
Link IT to Planning and Budgeting process
-
Not just in Central IT but at unit level as well
-
Share information to maximize impact of investments
-
Exchange 2003
-
Planned migration during July
-
Enhance functionality
-
Test servers already up and running
-
Improvements by move to Exchange 2003
-
OWA interface
-
RPC over HTTP available (VPN will not be necessary)
-
Improved efficiency and security (compression and encryption)
-
Outlook mobile feature
-
ActiveSync
-
E-mail Archive
-
Planned implementation date: July 27
-
Reduce the number of high performance disks necessary for storing email
-
Archive oldest items in mailboxes over 100MB
-
Archived item will be replaced with a shortcut. Icon will be different than regular mail in order to distinguish it. Archived item will still be available but will have slower access time
-
Use Web interface to manage, search archive and restore message from archive
-
Archive will impact Inbox only, does not impact calendar, contacts, personal or public folders
-
Legal counsel has approved
-
Education campaign will be in place
-
Quota of 1GB for archive. Archive is compressed
-
Items in archive over two years old will be deleted
-
Large attachments will be archived
-
Blackberry
-
Upgrade to 4.0 BES completed
-
Blackberry users must update their software to version 4 to take advantage of new features
-
Expanded to two servers
-
myASU (uPortal)
-
Departmental development now supported
-
Two hour training for channel developers
-
New look and feel with increased functionality
-
HelpDesk Services
-
Expanding hours in August: 6:30AM – 12:30AM daily
-
Improve communications among Helpdesk systems across campuses for better coordination
-
Currently there are approximately 7 helpdesk systems being used
-
Encourage folks to use common trouble ticket system
-
Administrative Systems
-
All under review for possible refresh/replacement including SIS, HR, Finance
-
Primary issue is the cost of implementing a new system
-
Data Network
-
Two diverse path gigabit connections to Internet
-
Sterling Networks is our new ISP provider
-
ISP service is 200Mbps
-
Previously had 4 ISPs but now have service level agreement with Sterling
-
Reduction of cost by move to Sterling which will allow aggregation with NAU and UofA to further reduce cost
-
Joining CENIC (Corporation for Education Network Initiatives in California)
-
Internet 2
-
National Lambda Rail (NLR)
-
Next incarnation of high speed networking
-
Configure dedicated research paths between institutions
-
Getting into CENIC through NLR
-
Wireless Network Expansion
-
Enhanced wireless access
-
Guest access service
-
Cisco Clean Access (Perfigo)
-
Downtown Tempe Public Wireless
-
Possibility of Downtown Phoenix as well
-
CDP status
-
Research Cluster network investigation
-
Valley Light Rail Fiber
-
72 strands of fiber to be laid under the rail system
-
Possibility of Metropolitan Research Network (preliminary stage)
-
Fulton School Network Support
-
Joint collaboration with Fulton School of Engineering to move networking into central IT
-
ASURite Infrastructure
-
Doubled uPortal servers
-
Increased Webauth servers
-
Upgraded DB2 environment
-
Installed enhanced DHCP
-
Upgraded IMAP servers
-
New strong password procedure
-
Implement in June (now)
-
New individuals and individuals changing current password will need to use a complex password
-
Procedure will be enforced in November
-
Telephone Services
-
Modular messaging
-
Network assessments
-
VoIP pilots
-
Develop cell phone strategy for enhanced coverage for interior/exterior spaces
-
New Computing Sites
-
ISTB1 = 5,000 sq ft space primarily for researchers
-
Downtown campus
-
Blackboard
-
Fall 2004 -> 3,080 courses with 49,200 students
-
Spring 2005 -> 3,109 courses with 49,800 students
-
HD inquires
-
2004 Jan-Dec -> 10,890
-
2005 Jan-May -> 4,310
-
8 servers with fully mirrored disks
-
Fall 2004 -> peaked at 100% during finals. Tuning done for Spring 2005 kept utilization below 60%
-
Instruction Support
-
Breeze = multimedia
-
Flex = Data visualization
-
Turnitin = Plagiarism prevention
-
AccessW = Video collaboration
-
Services
-
Ruckus Network = digital video/audio subscription service
-
Research Computing
-
Held sessions with faculty to discuss needs
-
No architecture will work for all
-
Upgraded existing research computing servers
-
Ordered two Cray XDL systems
-
Looking for large memory grid system that can be grown
-
Classroom/Computing Sites
-
Upgraded 192 old systems
-
4127 classroom support calls
-
569 Instructor training sessions
-
9 classroom performance systems installed with 10 more to be installed over the summer
-
Charge for print in classrooms this fall
-
Implementing ‘Virtual Site’
|